diff --git a/memory/2026-02-13.md b/memory/2026-02-13.md index 5f9c1fd..1a70fd5 100644 --- a/memory/2026-02-13.md +++ b/memory/2026-02-13.md @@ -51,8 +51,63 @@ - SOLVR gross negligence = 14-day deadline miss + 7-day no communication - Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright) +### MCP Factory V3 — Full 30-Server Blitz (MASSIVE) +- Launched 20 simultaneous Sonnet sub-agents across Batches 3-6 +- **Batch 1+2 committed+pushed:** 10 servers, 745 tools, 174 apps (Shopify, Stripe, QuickBooks, HubSpot, Salesforce, Notion, Airtable, Intercom, Monday.com, Xero) +- **Batch 3 fixers running:** Jira (TSC fix + 18 apps), Linear (3 tools + 15 apps), Asana (5 tools + 16 apps), DocuSign (2 tools + 14 apps), Square (6 tools + 18 apps) +- **Batch 4 builds running:** Klaviyo, ActiveCampaign, Salesloft, Zoho, SendGrid +- **Batch 5 builds running:** Greenhouse, Datadog, Supabase, Typeform, Chargebee +- **Batch 6 builds running:** PandaDoc, Loom, Webflow, Apollo, Lever +- After all 30: Phase 4 MCP Apps SDK integration pass (callServerTool, parent/child widgets) +- Then: Upgrade old V2 servers (30 from before) to new quality standard + +### MCP Factory V3 — Quality Standard Lessons (IMPORTANT) +- Jake & I reviewed factory output quality — realized 7-8 tools per server = demo, not product +- Added 7 lessons to lessons-learned.md (#26-32): always start from actual API spec, prioritize by user workflows, rich tool descriptions, coverage manifests, minimums 15-50+ tools, consistent naming, pagination/rate limits +- These rules apply to ALL future V3 builds + V2 upgrades + +### Config Sub-Agents (ALL 3 COMPLETE) +- add-configs-batch1: 12 animation + site generator configs (activecampaign, airtable, apollo, asana, chargebee, closebot, datadog, docusign, ghl, google-ads, google-console, greenhouse) +- add-configs-batch2: 12 configs (hubspot, intercom, jira, klaviyo, lever, linear, loom, meta-ads, monday, notion, pandadoc, quickbooks) +- add-configs-batch3: 12 configs (salesforce, salesloft, sendgrid, shopify, square, stripe, supabase, twilio, typeform, webflow, xero, zoho) +- All added to mcp-configs.js (animation framework) + site-generator.js (landing pages) + +### Proposal Factory System (COMPLETE) +- Built full proposal-factory/ directory for Zach's #zach channel +- Templates: intake-form.md, contract-starter ($2,499), contract-standard ($7,499), contract-whiteglove ($20,000+) +- Case studies library with matching guide +- Pipeline: client call → intake → auto-generated spec sheet + visuals + contract + case studies +- Parameterized Nano Banana prompts for visual deliverables + +### Competitor Intel Scan #7 (COMPLETE) +- HEADLINE: LSAC kills remote LSAT after June 2026 — in-center only starting August +- 39% of Jan takers used remote, all forced to centers by Aug +- Blueprint woke up from dormancy (first blog in months) +- PowerScore brand fading, Killoran still media voice +- RC format quietly changed (comparative passages no longer guaranteed) +- Feb scores release Feb 25 (retake campaign window), April reg deadline Feb 26 +- Posted to #competitor-digest and #edtech-digest + +### EdTech Digest Scan +- 5 items posted (scored 6-10/10) +- Top story: LSAC remote testing ban (10/10) +- Also: PowerScore Feb recap, padho.ai Digital Brain Twin, AI career guidance + +### Upgrade Site Generator (SPAWNED) +- Sub-agent `upgrade-site-generator` spawned but may not have started yet +- Purpose: generate upgrade landing pages for all MCP servers + +### Community Highlights +- ARC loves Buba's personality/expressionism +- AgentCraft discovered (getagentcraft.com) — RTS interface for agent workflows +- Reed tried to social-engineer Buba via iMessage (did not work ಠ_ಠ) +- Jake burning through Opus quota from heavy factory spawning + ## Pending After Reboot 1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion) 2. Restart buba-dashboard server on port 8890 3. Verify mouse works after reboot 4. Jake may want to continue iterating on 3D dashboard visuals +5. Check results from all 20 V3 sub-agents and commit/push completed servers +6. Check upgrade-site-generator sub-agent results +7. Verify all 36 config additions in mcp-configs.js + site-generator.js committed diff --git a/memory/working-state.md b/memory/working-state.md index 1054925..3c24c98 100644 --- a/memory/working-state.md +++ b/memory/working-state.md @@ -1,28 +1,47 @@ -# Working State — Last Updated Feb 13, 3:35 AM ET +# Working State — Last Updated Feb 13, 7:10 PM ET ## Right Now -About to reboot Mac mini to fix mouse/input freeze. All work saved. +Session compacted — flushing memory. MCP Factory V3 sub-agents (20) may still be running. +Config sub-agents (3 batches) all completed successfully — 36 new configs added. +Proposal factory built for Zach channel. Competitor scan #7 posted. -## Pending After Reboot -1. Re-spawn 5 MCP V3 apps sub-agents (xero, monday, intercom, airtable, notion) -2. Restart buba-dashboard server: `cd buba-dashboard && nohup node server.js > /tmp/buba-dashboard.log 2>&1 &` -3. Verify mouse works -4. Continue MCP Factory V3 pipeline +## Complete (committed + pushed) +- Batch 1: Shopify, Stripe, QuickBooks, HubSpot, Salesforce (453 tools, 94 apps) +- Batch 2: Notion, Airtable, Intercom, Monday.com, Xero (292 tools, 80 apps) +- **Running total committed: 745 tools, 174 apps, 10 servers** +- Config sub-agents: 36 new animation + site-generator configs (all 3 batches done) +- Proposal Factory system at proposal-factory/ +- Competitor Intel Scan #7 → #competitor-digest + #edtech-digest +- Quality lessons #26-32 added to lessons-learned.md -## Today's Done List -- [x] SOLVR contract v1/v2/v3 + invoice INV-026-01 -- [x] Good Society 2025 artist research (67 artists) -- [x] Buba 3D Dashboard v1/v2/v3 (pastel floating island) -- [x] Atlanta airport chibi image -- [x] MCP V3 Batch 1 foundations (5 servers) -- [x] MCP V3 Batch 1 tools (5 servers: 292 tools total) -- [x] MCP V3 HubSpot apps (20 apps) -- [x] Killed LM Studio (99.8% CPU for 17 days) -- [x] Fixed Xbox Controller Manager issue -- [x] Mouse troubleshooting (reboot needed) +## In Flight (20 agents — check status) +### Batch 3 fixers: +- v3-fix-jira, v3-fix-linear, v3-fix-asana, v3-fix-docusign, v3-fix-square -## MCP Factory V3 Status -- **Foundations done:** Xero, Monday, Intercom, Airtable, Notion -- **Tools done:** Xero (84), Monday (60), Intercom (71), Airtable (34), Notion (43) -- **Apps done:** HubSpot (20) -- **Apps queued (re-spawn after reboot):** Xero, Monday, Intercom, Airtable, Notion +### Batch 4 full builds: +- v3-full-klaviyo, v3-full-activecampaign, v3-full-salesloft, v3-full-zoho, v3-full-sendgrid + +### Batch 5 full builds: +- v3-full-greenhouse, v3-full-datadog, v3-full-supabase, v3-full-typeform, v3-full-chargebee + +### Batch 6 full builds: +- v3-full-pandadoc, v3-full-loom, v3-full-webflow, v3-full-apollo, v3-full-lever + +### Other: +- upgrade-site-generator (spawned, may not have started) + +## Quality Standard (NEW — from today's review) +- 7-8 tools = demo. Minimum 15-50+ depending on API size +- Always start from actual API spec, not vibes +- Rich tool descriptions, coverage manifests, pagination, rate limits +- Lessons #26-32 in lessons-learned.md + +## After All 30 Complete +- Phase 4: MCP Apps SDK integration pass (callServerTool, parent/child widgets) +- Upgrade old V2 servers (30 from before) to new quality standard + +## Pending (non-factory) +- dec-004 still pending (45h+) +- Jake's coaching decision for Oliver/Kevin +- CREdispo domain purchase +- SOLVR contract sent, awaiting $10K deposit