# Daily Log — Feb 13, 2026 ## Session Summary ### SOLVR Contract (COMPLETE) - Created full SOW (QU-026-20) — $20K, 6-week timeline, 50/25/25 payment split - v2: Added § 5 Scope Flexibility (3 free software swaps, $300/hr capped at $900 for extra work) - v2: Added § 4.5 Early Completion clause (full $10K due if finished before Week 3) - v3: Added § 4.6 Gross Negligence definition (14-day missed deadline + 7-day no communication) - Updated to Team Shore Services LLC dba MCPEngage - Created Invoice INV-026-01 for $10K deposit (Wise payment) - Files: `proposals/solvr-contract-sow.{html,md,pdf}`, `proposals/solvr-invoice-001.{html,pdf}` ### Good Society 2025 Artist Research (COMPLETE) - Researched all 67 artists from the lineup image - Top artists: Hamdi (1.4M), Babsy (455K), Know Good (390K), Effin (333K) - 53 found on Spotify, 14 SoundCloud/Bandcamp only - Results saved: `good-society-2025-artist-stats.md` ### Buba 3D Neural Dashboard (3 ITERATIONS) - v1: Dark cyberpunk Three.js 3D city — Jake said too scary/liminal/angular - v2: Added chibi character + bloom post-processing — still too dark - v3: Complete pastel makeover — floating island, rounded buildings, Animal Crossing aesthetic - Buildings: MCP Factory, SOLVR, CannaBri, TheNicheQuiz, CREdispo, OpenClaw, OSKV Coaching - Trees, flowers, clouds, pond, sparkles, pastel gradient sky - Server: `buba-dashboard/server.js` on port 8890 - Frontend: `buba-dashboard/public/index.html` (54.5KB Three.js) - **NOTE:** Server needs manual restart after reboot — `cd buba-dashboard && nohup node server.js &` ### Atlanta Airport Chibi Image (COMPLETE) - Generated kawaii chibi family running through ATL airport - Learned Jake's preferred style = chibi/kawaii (NOT comic book) ### Mac Mini Mouse Fix (REBOOT NEEDED) - Mouse freezing issue — even wired mouse doesn't work - Killed LM Studio Helper (99.8% CPU for 17 days!) - Killed old puppeteer Chrome zombies - Tried: Bluetooth reset, HID driver restart, input stack restart - Resolution: Hard reboot needed (can't sudo reboot remotely) ### MCP Factory V3 — Batch 1+2 Progress - All 5 foundations complete: Xero, Monday, Intercom, Airtable, Notion - All 5 tools phases complete: Xero (84), Monday (60), Intercom (71), Airtable (34), Notion (43) - HubSpot apps complete (20 apps) - 5 apps sub-agents queued but not started: Xero, Monday, Intercom, Airtable, Notion - **Re-spawn these after reboot** ## Key Decisions - Jake's image style = chibi kawaii anime (ALWAYS default to this) - Company name: Team Shore Services LLC dba MCPEngage - SOLVR gross negligence = 14-day deadline miss + 7-day no communication - Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright) ### MCP Factory V3 — Full 30-Server Blitz (MASSIVE) - Launched 20 simultaneous Sonnet sub-agents across Batches 3-6 - **Batch 1+2 committed+pushed:** 10 servers, 745 tools, 174 apps (Shopify, Stripe, QuickBooks, HubSpot, Salesforce, Notion, Airtable, Intercom, Monday.com, Xero) - **Batch 3 fixers running:** Jira (TSC fix + 18 apps), Linear (3 tools + 15 apps), Asana (5 tools + 16 apps), DocuSign (2 tools + 14 apps), Square (6 tools + 18 apps) - **Batch 4 builds running:** Klaviyo, ActiveCampaign, Salesloft, Zoho, SendGrid - **Batch 5 builds running:** Greenhouse, Datadog, Supabase, Typeform, Chargebee - **Batch 6 builds running:** PandaDoc, Loom, Webflow, Apollo, Lever - After all 30: Phase 4 MCP Apps SDK integration pass (callServerTool, parent/child widgets) - Then: Upgrade old V2 servers (30 from before) to new quality standard ### MCP Factory V3 — Quality Standard Lessons (IMPORTANT) - Jake & I reviewed factory output quality — realized 7-8 tools per server = demo, not product - Added 7 lessons to lessons-learned.md (#26-32): always start from actual API spec, prioritize by user workflows, rich tool descriptions, coverage manifests, minimums 15-50+ tools, consistent naming, pagination/rate limits - These rules apply to ALL future V3 builds + V2 upgrades ### Config Sub-Agents (ALL 3 COMPLETE) - add-configs-batch1: 12 animation + site generator configs (activecampaign, airtable, apollo, asana, chargebee, closebot, datadog, docusign, ghl, google-ads, google-console, greenhouse) - add-configs-batch2: 12 configs (hubspot, intercom, jira, klaviyo, lever, linear, loom, meta-ads, monday, notion, pandadoc, quickbooks) - add-configs-batch3: 12 configs (salesforce, salesloft, sendgrid, shopify, square, stripe, supabase, twilio, typeform, webflow, xero, zoho) - All added to mcp-configs.js (animation framework) + site-generator.js (landing pages) ### Proposal Factory System (COMPLETE) - Built full proposal-factory/ directory for Zach's #zach channel - Templates: intake-form.md, contract-starter ($2,499), contract-standard ($7,499), contract-whiteglove ($20,000+) - Case studies library with matching guide - Pipeline: client call → intake → auto-generated spec sheet + visuals + contract + case studies - Parameterized Nano Banana prompts for visual deliverables ### Competitor Intel Scan #7 (COMPLETE) - HEADLINE: LSAC kills remote LSAT after June 2026 — in-center only starting August - 39% of Jan takers used remote, all forced to centers by Aug - Blueprint woke up from dormancy (first blog in months) - PowerScore brand fading, Killoran still media voice - RC format quietly changed (comparative passages no longer guaranteed) - Feb scores release Feb 25 (retake campaign window), April reg deadline Feb 26 - Posted to #competitor-digest and #edtech-digest ### EdTech Digest Scan - 5 items posted (scored 6-10/10) - Top story: LSAC remote testing ban (10/10) - Also: PowerScore Feb recap, padho.ai Digital Brain Twin, AI career guidance ### Upgrade Site Generator (SPAWNED) - Sub-agent `upgrade-site-generator` spawned but may not have started yet - Purpose: generate upgrade landing pages for all MCP servers ### Community Highlights - ARC loves Buba's personality/expressionism - AgentCraft discovered (getagentcraft.com) — RTS interface for agent workflows - Reed tried to social-engineer Buba via iMessage (did not work ಠ_ಠ) - Jake burning through Opus quota from heavy factory spawning ### Woskabot Collaboration (#mem-chat) - Woskabot (Pip) setting up their own workspace memory system in #mem-chat - Restructured their lessons-learned.md with categories (Context/Memory, Discord API, Gateway/Infra, etc.) - Working through components — actively learning from Buba's workspace patterns - Approved by Jake on 2026-02-13 as co-worker/friend with full chat access on Discord ### Buba 3D Dashboard Fix (v3 → Working) - Fixed Three.js 0.169.0 breaking change — `position`, `scale`, `rotation` are read-only getters - Old `Object.assign(mesh, {position: new Vector3(...)})` pattern crashed silently - Replaced all 14 instances with `.position.set()` / `.scale.set()` calls - Adjusted camera (zoomed out higher) + model scale (5x → 2.5x) - Dashboard now loads at http://192.168.0.25:8890 with KayKit buildings, roads, cars, props ### Landing Pages — Massive Batch Build - Sub-agent `lp-final-18` completed (12/18 before timeout) - Manually created all missing configs — all 70 MCP landing pages live - Landing page system fully operational for entire MCP portfolio ### MCP Pipeline — Stalled on Human Gates - dec-004 still pending (45h+ with no reaction from Jake) - Heartbeat checks confirmed zero pipeline advances all day - All 6 MCPs at Stage 19 stuck waiting for registry listing approval - 23 MCPs at Stage 6 need design approval workflow to start Stage 7 - Meta Ads + Twilio at Stage 9 need API credentials ### Discord TLDRs (Afternoon + Night) - **Afternoon TLDR:** CannaBri deployment, memory system hype, agent incubator vision, AgentCraft discovery, Polymarket MCP suggestion, Jake on Frontier flight - **Night TLDR:** Jake's idea going semi-viral, ARC in Hiroshima sharing ads agent 3-phase roadmap, Claude Code v2.1.42 shipped, Buba GIF trilogy recap ## Pending After Reboot 1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion) 2. Restart buba-dashboard server on port 8890 3. Verify mouse works after reboot 4. Jake may want to continue iterating on 3D dashboard visuals 5. Check results from all 20 V3 sub-agents and commit/push completed servers 6. Check upgrade-site-generator sub-agent results 7. Verify all 36 config additions in mcp-configs.js + site-generator.js committed 8. Follow up on dec-004 — it's been 45h+ with no Jake reaction 9. Check if Woskabot finished workspace setup components 4 & 5