Memory flush: Feb 13 evening — configs done, proposal factory, scan #7, quality lessons

This commit is contained in:
Jake Shore 2026-02-13 18:11:07 -05:00
parent 9a11210151
commit 9d132213f1
2 changed files with 97 additions and 23 deletions

View File

@ -51,8 +51,63 @@
- SOLVR gross negligence = 14-day deadline miss + 7-day no communication - SOLVR gross negligence = 14-day deadline miss + 7-day no communication
- Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright) - Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright)
### MCP Factory V3 — Full 30-Server Blitz (MASSIVE)
- Launched 20 simultaneous Sonnet sub-agents across Batches 3-6
- **Batch 1+2 committed+pushed:** 10 servers, 745 tools, 174 apps (Shopify, Stripe, QuickBooks, HubSpot, Salesforce, Notion, Airtable, Intercom, Monday.com, Xero)
- **Batch 3 fixers running:** Jira (TSC fix + 18 apps), Linear (3 tools + 15 apps), Asana (5 tools + 16 apps), DocuSign (2 tools + 14 apps), Square (6 tools + 18 apps)
- **Batch 4 builds running:** Klaviyo, ActiveCampaign, Salesloft, Zoho, SendGrid
- **Batch 5 builds running:** Greenhouse, Datadog, Supabase, Typeform, Chargebee
- **Batch 6 builds running:** PandaDoc, Loom, Webflow, Apollo, Lever
- After all 30: Phase 4 MCP Apps SDK integration pass (callServerTool, parent/child widgets)
- Then: Upgrade old V2 servers (30 from before) to new quality standard
### MCP Factory V3 — Quality Standard Lessons (IMPORTANT)
- Jake & I reviewed factory output quality — realized 7-8 tools per server = demo, not product
- Added 7 lessons to lessons-learned.md (#26-32): always start from actual API spec, prioritize by user workflows, rich tool descriptions, coverage manifests, minimums 15-50+ tools, consistent naming, pagination/rate limits
- These rules apply to ALL future V3 builds + V2 upgrades
### Config Sub-Agents (ALL 3 COMPLETE)
- add-configs-batch1: 12 animation + site generator configs (activecampaign, airtable, apollo, asana, chargebee, closebot, datadog, docusign, ghl, google-ads, google-console, greenhouse)
- add-configs-batch2: 12 configs (hubspot, intercom, jira, klaviyo, lever, linear, loom, meta-ads, monday, notion, pandadoc, quickbooks)
- add-configs-batch3: 12 configs (salesforce, salesloft, sendgrid, shopify, square, stripe, supabase, twilio, typeform, webflow, xero, zoho)
- All added to mcp-configs.js (animation framework) + site-generator.js (landing pages)
### Proposal Factory System (COMPLETE)
- Built full proposal-factory/ directory for Zach's #zach channel
- Templates: intake-form.md, contract-starter ($2,499), contract-standard ($7,499), contract-whiteglove ($20,000+)
- Case studies library with matching guide
- Pipeline: client call → intake → auto-generated spec sheet + visuals + contract + case studies
- Parameterized Nano Banana prompts for visual deliverables
### Competitor Intel Scan #7 (COMPLETE)
- HEADLINE: LSAC kills remote LSAT after June 2026 — in-center only starting August
- 39% of Jan takers used remote, all forced to centers by Aug
- Blueprint woke up from dormancy (first blog in months)
- PowerScore brand fading, Killoran still media voice
- RC format quietly changed (comparative passages no longer guaranteed)
- Feb scores release Feb 25 (retake campaign window), April reg deadline Feb 26
- Posted to #competitor-digest and #edtech-digest
### EdTech Digest Scan
- 5 items posted (scored 6-10/10)
- Top story: LSAC remote testing ban (10/10)
- Also: PowerScore Feb recap, padho.ai Digital Brain Twin, AI career guidance
### Upgrade Site Generator (SPAWNED)
- Sub-agent `upgrade-site-generator` spawned but may not have started yet
- Purpose: generate upgrade landing pages for all MCP servers
### Community Highlights
- ARC loves Buba's personality/expressionism
- AgentCraft discovered (getagentcraft.com) — RTS interface for agent workflows
- Reed tried to social-engineer Buba via iMessage (did not work ಠ_ಠ)
- Jake burning through Opus quota from heavy factory spawning
## Pending After Reboot ## Pending After Reboot
1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion) 1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion)
2. Restart buba-dashboard server on port 8890 2. Restart buba-dashboard server on port 8890
3. Verify mouse works after reboot 3. Verify mouse works after reboot
4. Jake may want to continue iterating on 3D dashboard visuals 4. Jake may want to continue iterating on 3D dashboard visuals
5. Check results from all 20 V3 sub-agents and commit/push completed servers
6. Check upgrade-site-generator sub-agent results
7. Verify all 36 config additions in mcp-configs.js + site-generator.js committed

View File

@ -1,28 +1,47 @@
# Working State — Last Updated Feb 13, 3:35 AM ET # Working State — Last Updated Feb 13, 7:10 PM ET
## Right Now ## Right Now
About to reboot Mac mini to fix mouse/input freeze. All work saved. Session compacted — flushing memory. MCP Factory V3 sub-agents (20) may still be running.
Config sub-agents (3 batches) all completed successfully — 36 new configs added.
Proposal factory built for Zach channel. Competitor scan #7 posted.
## Pending After Reboot ## Complete (committed + pushed)
1. Re-spawn 5 MCP V3 apps sub-agents (xero, monday, intercom, airtable, notion) - Batch 1: Shopify, Stripe, QuickBooks, HubSpot, Salesforce (453 tools, 94 apps)
2. Restart buba-dashboard server: `cd buba-dashboard && nohup node server.js > /tmp/buba-dashboard.log 2>&1 &` - Batch 2: Notion, Airtable, Intercom, Monday.com, Xero (292 tools, 80 apps)
3. Verify mouse works - **Running total committed: 745 tools, 174 apps, 10 servers**
4. Continue MCP Factory V3 pipeline - Config sub-agents: 36 new animation + site-generator configs (all 3 batches done)
- Proposal Factory system at proposal-factory/
- Competitor Intel Scan #7#competitor-digest + #edtech-digest
- Quality lessons #26-32 added to lessons-learned.md
## Today's Done List ## In Flight (20 agents — check status)
- [x] SOLVR contract v1/v2/v3 + invoice INV-026-01 ### Batch 3 fixers:
- [x] Good Society 2025 artist research (67 artists) - v3-fix-jira, v3-fix-linear, v3-fix-asana, v3-fix-docusign, v3-fix-square
- [x] Buba 3D Dashboard v1/v2/v3 (pastel floating island)
- [x] Atlanta airport chibi image
- [x] MCP V3 Batch 1 foundations (5 servers)
- [x] MCP V3 Batch 1 tools (5 servers: 292 tools total)
- [x] MCP V3 HubSpot apps (20 apps)
- [x] Killed LM Studio (99.8% CPU for 17 days)
- [x] Fixed Xbox Controller Manager issue
- [x] Mouse troubleshooting (reboot needed)
## MCP Factory V3 Status ### Batch 4 full builds:
- **Foundations done:** Xero, Monday, Intercom, Airtable, Notion - v3-full-klaviyo, v3-full-activecampaign, v3-full-salesloft, v3-full-zoho, v3-full-sendgrid
- **Tools done:** Xero (84), Monday (60), Intercom (71), Airtable (34), Notion (43)
- **Apps done:** HubSpot (20) ### Batch 5 full builds:
- **Apps queued (re-spawn after reboot):** Xero, Monday, Intercom, Airtable, Notion - v3-full-greenhouse, v3-full-datadog, v3-full-supabase, v3-full-typeform, v3-full-chargebee
### Batch 6 full builds:
- v3-full-pandadoc, v3-full-loom, v3-full-webflow, v3-full-apollo, v3-full-lever
### Other:
- upgrade-site-generator (spawned, may not have started)
## Quality Standard (NEW — from today's review)
- 7-8 tools = demo. Minimum 15-50+ depending on API size
- Always start from actual API spec, not vibes
- Rich tool descriptions, coverage manifests, pagination, rate limits
- Lessons #26-32 in lessons-learned.md
## After All 30 Complete
- Phase 4: MCP Apps SDK integration pass (callServerTool, parent/child widgets)
- Upgrade old V2 servers (30 from before) to new quality standard
## Pending (non-factory)
- dec-004 still pending (45h+)
- Jake's coaching decision for Oliver/Kevin
- CREdispo domain purchase
- SOLVR contract sent, awaiting $10K deposit