Memory flush: Feb 13 evening — configs done, proposal factory, scan #7, quality lessons

This commit is contained in:
Jake Shore 2026-02-13 18:11:07 -05:00
parent 9a11210151
commit 9d132213f1
2 changed files with 97 additions and 23 deletions

View File

@ -51,8 +51,63 @@
- SOLVR gross negligence = 14-day deadline miss + 7-day no communication
- Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright)
### MCP Factory V3 — Full 30-Server Blitz (MASSIVE)
- Launched 20 simultaneous Sonnet sub-agents across Batches 3-6
- **Batch 1+2 committed+pushed:** 10 servers, 745 tools, 174 apps (Shopify, Stripe, QuickBooks, HubSpot, Salesforce, Notion, Airtable, Intercom, Monday.com, Xero)
- **Batch 3 fixers running:** Jira (TSC fix + 18 apps), Linear (3 tools + 15 apps), Asana (5 tools + 16 apps), DocuSign (2 tools + 14 apps), Square (6 tools + 18 apps)
- **Batch 4 builds running:** Klaviyo, ActiveCampaign, Salesloft, Zoho, SendGrid
- **Batch 5 builds running:** Greenhouse, Datadog, Supabase, Typeform, Chargebee
- **Batch 6 builds running:** PandaDoc, Loom, Webflow, Apollo, Lever
- After all 30: Phase 4 MCP Apps SDK integration pass (callServerTool, parent/child widgets)
- Then: Upgrade old V2 servers (30 from before) to new quality standard
### MCP Factory V3 — Quality Standard Lessons (IMPORTANT)
- Jake & I reviewed factory output quality — realized 7-8 tools per server = demo, not product
- Added 7 lessons to lessons-learned.md (#26-32): always start from actual API spec, prioritize by user workflows, rich tool descriptions, coverage manifests, minimums 15-50+ tools, consistent naming, pagination/rate limits
- These rules apply to ALL future V3 builds + V2 upgrades
### Config Sub-Agents (ALL 3 COMPLETE)
- add-configs-batch1: 12 animation + site generator configs (activecampaign, airtable, apollo, asana, chargebee, closebot, datadog, docusign, ghl, google-ads, google-console, greenhouse)
- add-configs-batch2: 12 configs (hubspot, intercom, jira, klaviyo, lever, linear, loom, meta-ads, monday, notion, pandadoc, quickbooks)
- add-configs-batch3: 12 configs (salesforce, salesloft, sendgrid, shopify, square, stripe, supabase, twilio, typeform, webflow, xero, zoho)
- All added to mcp-configs.js (animation framework) + site-generator.js (landing pages)
### Proposal Factory System (COMPLETE)
- Built full proposal-factory/ directory for Zach's #zach channel
- Templates: intake-form.md, contract-starter ($2,499), contract-standard ($7,499), contract-whiteglove ($20,000+)
- Case studies library with matching guide
- Pipeline: client call → intake → auto-generated spec sheet + visuals + contract + case studies
- Parameterized Nano Banana prompts for visual deliverables
### Competitor Intel Scan #7 (COMPLETE)
- HEADLINE: LSAC kills remote LSAT after June 2026 — in-center only starting August
- 39% of Jan takers used remote, all forced to centers by Aug
- Blueprint woke up from dormancy (first blog in months)
- PowerScore brand fading, Killoran still media voice
- RC format quietly changed (comparative passages no longer guaranteed)
- Feb scores release Feb 25 (retake campaign window), April reg deadline Feb 26
- Posted to #competitor-digest and #edtech-digest
### EdTech Digest Scan
- 5 items posted (scored 6-10/10)
- Top story: LSAC remote testing ban (10/10)
- Also: PowerScore Feb recap, padho.ai Digital Brain Twin, AI career guidance
### Upgrade Site Generator (SPAWNED)
- Sub-agent `upgrade-site-generator` spawned but may not have started yet
- Purpose: generate upgrade landing pages for all MCP servers
### Community Highlights
- ARC loves Buba's personality/expressionism
- AgentCraft discovered (getagentcraft.com) — RTS interface for agent workflows
- Reed tried to social-engineer Buba via iMessage (did not work ಠ_ಠ)
- Jake burning through Opus quota from heavy factory spawning
## Pending After Reboot
1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion)
2. Restart buba-dashboard server on port 8890
3. Verify mouse works after reboot
4. Jake may want to continue iterating on 3D dashboard visuals
5. Check results from all 20 V3 sub-agents and commit/push completed servers
6. Check upgrade-site-generator sub-agent results
7. Verify all 36 config additions in mcp-configs.js + site-generator.js committed

View File

@ -1,28 +1,47 @@
# Working State — Last Updated Feb 13, 3:35 AM ET
# Working State — Last Updated Feb 13, 7:10 PM ET
## Right Now
About to reboot Mac mini to fix mouse/input freeze. All work saved.
Session compacted — flushing memory. MCP Factory V3 sub-agents (20) may still be running.
Config sub-agents (3 batches) all completed successfully — 36 new configs added.
Proposal factory built for Zach channel. Competitor scan #7 posted.
## Pending After Reboot
1. Re-spawn 5 MCP V3 apps sub-agents (xero, monday, intercom, airtable, notion)
2. Restart buba-dashboard server: `cd buba-dashboard && nohup node server.js > /tmp/buba-dashboard.log 2>&1 &`
3. Verify mouse works
4. Continue MCP Factory V3 pipeline
## Complete (committed + pushed)
- Batch 1: Shopify, Stripe, QuickBooks, HubSpot, Salesforce (453 tools, 94 apps)
- Batch 2: Notion, Airtable, Intercom, Monday.com, Xero (292 tools, 80 apps)
- **Running total committed: 745 tools, 174 apps, 10 servers**
- Config sub-agents: 36 new animation + site-generator configs (all 3 batches done)
- Proposal Factory system at proposal-factory/
- Competitor Intel Scan #7#competitor-digest + #edtech-digest
- Quality lessons #26-32 added to lessons-learned.md
## Today's Done List
- [x] SOLVR contract v1/v2/v3 + invoice INV-026-01
- [x] Good Society 2025 artist research (67 artists)
- [x] Buba 3D Dashboard v1/v2/v3 (pastel floating island)
- [x] Atlanta airport chibi image
- [x] MCP V3 Batch 1 foundations (5 servers)
- [x] MCP V3 Batch 1 tools (5 servers: 292 tools total)
- [x] MCP V3 HubSpot apps (20 apps)
- [x] Killed LM Studio (99.8% CPU for 17 days)
- [x] Fixed Xbox Controller Manager issue
- [x] Mouse troubleshooting (reboot needed)
## In Flight (20 agents — check status)
### Batch 3 fixers:
- v3-fix-jira, v3-fix-linear, v3-fix-asana, v3-fix-docusign, v3-fix-square
## MCP Factory V3 Status
- **Foundations done:** Xero, Monday, Intercom, Airtable, Notion
- **Tools done:** Xero (84), Monday (60), Intercom (71), Airtable (34), Notion (43)
- **Apps done:** HubSpot (20)
- **Apps queued (re-spawn after reboot):** Xero, Monday, Intercom, Airtable, Notion
### Batch 4 full builds:
- v3-full-klaviyo, v3-full-activecampaign, v3-full-salesloft, v3-full-zoho, v3-full-sendgrid
### Batch 5 full builds:
- v3-full-greenhouse, v3-full-datadog, v3-full-supabase, v3-full-typeform, v3-full-chargebee
### Batch 6 full builds:
- v3-full-pandadoc, v3-full-loom, v3-full-webflow, v3-full-apollo, v3-full-lever
### Other:
- upgrade-site-generator (spawned, may not have started)
## Quality Standard (NEW — from today's review)
- 7-8 tools = demo. Minimum 15-50+ depending on API size
- Always start from actual API spec, not vibes
- Rich tool descriptions, coverage manifests, pagination, rate limits
- Lessons #26-32 in lessons-learned.md
## After All 30 Complete
- Phase 4: MCP Apps SDK integration pass (callServerTool, parent/child widgets)
- Upgrade old V2 servers (30 from before) to new quality standard
## Pending (non-factory)
- dec-004 still pending (45h+)
- Jake's coaching decision for Oliver/Kevin
- CREdispo domain purchase
- SOLVR contract sent, awaiting $10K deposit