2026-02-14 23:01:35 -05:00

9.6 KiB

Daily Log — Feb 13, 2026

Session Summary

SOLVR Contract (COMPLETE)

  • Created full SOW (QU-026-20) — $20K, 6-week timeline, 50/25/25 payment split
  • v2: Added § 5 Scope Flexibility (3 free software swaps, $300/hr capped at $900 for extra work)
  • v2: Added § 4.5 Early Completion clause (full $10K due if finished before Week 3)
  • v3: Added § 4.6 Gross Negligence definition (14-day missed deadline + 7-day no communication)
  • Updated to Team Shore Services LLC dba MCPEngage
  • Created Invoice INV-026-01 for $10K deposit (Wise payment)
  • Files: proposals/solvr-contract-sow.{html,md,pdf}, proposals/solvr-invoice-001.{html,pdf}

Good Society 2025 Artist Research (COMPLETE)

  • Researched all 67 artists from the lineup image
  • Top artists: Hamdi (1.4M), Babsy (455K), Know Good (390K), Effin (333K)
  • 53 found on Spotify, 14 SoundCloud/Bandcamp only
  • Results saved: good-society-2025-artist-stats.md

Buba 3D Neural Dashboard (3 ITERATIONS)

  • v1: Dark cyberpunk Three.js 3D city — Jake said too scary/liminal/angular
  • v2: Added chibi character + bloom post-processing — still too dark
  • v3: Complete pastel makeover — floating island, rounded buildings, Animal Crossing aesthetic
  • Buildings: MCP Factory, SOLVR, CannaBri, TheNicheQuiz, CREdispo, OpenClaw, OSKV Coaching
  • Trees, flowers, clouds, pond, sparkles, pastel gradient sky
  • Server: buba-dashboard/server.js on port 8890
  • Frontend: buba-dashboard/public/index.html (54.5KB Three.js)
  • NOTE: Server needs manual restart after reboot — cd buba-dashboard && nohup node server.js &

Atlanta Airport Chibi Image (COMPLETE)

  • Generated kawaii chibi family running through ATL airport
  • Learned Jake's preferred style = chibi/kawaii (NOT comic book)

Mac Mini Mouse Fix (REBOOT NEEDED)

  • Mouse freezing issue — even wired mouse doesn't work
  • Killed LM Studio Helper (99.8% CPU for 17 days!)
  • Killed old puppeteer Chrome zombies
  • Tried: Bluetooth reset, HID driver restart, input stack restart
  • Resolution: Hard reboot needed (can't sudo reboot remotely)

MCP Factory V3 — Batch 1+2 Progress

  • All 5 foundations complete: Xero, Monday, Intercom, Airtable, Notion
  • All 5 tools phases complete: Xero (84), Monday (60), Intercom (71), Airtable (34), Notion (43)
  • HubSpot apps complete (20 apps)
  • 5 apps sub-agents queued but not started: Xero, Monday, Intercom, Airtable, Notion
  • Re-spawn these after reboot

Key Decisions

  • Jake's image style = chibi kawaii anime (ALWAYS default to this)
  • Company name: Team Shore Services LLC dba MCPEngage
  • SOLVR gross negligence = 14-day deadline miss + 7-day no communication
  • Dashboard aesthetic: PASTEL, not cyberpunk (rounded, whimsical, bright)

MCP Factory V3 — Full 30-Server Blitz (MASSIVE)

  • Launched 20 simultaneous Sonnet sub-agents across Batches 3-6
  • Batch 1+2 committed+pushed: 10 servers, 745 tools, 174 apps (Shopify, Stripe, QuickBooks, HubSpot, Salesforce, Notion, Airtable, Intercom, Monday.com, Xero)
  • Batch 3 fixers running: Jira (TSC fix + 18 apps), Linear (3 tools + 15 apps), Asana (5 tools + 16 apps), DocuSign (2 tools + 14 apps), Square (6 tools + 18 apps)
  • Batch 4 builds running: Klaviyo, ActiveCampaign, Salesloft, Zoho, SendGrid
  • Batch 5 builds running: Greenhouse, Datadog, Supabase, Typeform, Chargebee
  • Batch 6 builds running: PandaDoc, Loom, Webflow, Apollo, Lever
  • After all 30: Phase 4 MCP Apps SDK integration pass (callServerTool, parent/child widgets)
  • Then: Upgrade old V2 servers (30 from before) to new quality standard

MCP Factory V3 — Quality Standard Lessons (IMPORTANT)

  • Jake & I reviewed factory output quality — realized 7-8 tools per server = demo, not product
  • Added 7 lessons to lessons-learned.md (#26-32): always start from actual API spec, prioritize by user workflows, rich tool descriptions, coverage manifests, minimums 15-50+ tools, consistent naming, pagination/rate limits
  • These rules apply to ALL future V3 builds + V2 upgrades

Config Sub-Agents (ALL 3 COMPLETE)

  • add-configs-batch1: 12 animation + site generator configs (activecampaign, airtable, apollo, asana, chargebee, closebot, datadog, docusign, ghl, google-ads, google-console, greenhouse)
  • add-configs-batch2: 12 configs (hubspot, intercom, jira, klaviyo, lever, linear, loom, meta-ads, monday, notion, pandadoc, quickbooks)
  • add-configs-batch3: 12 configs (salesforce, salesloft, sendgrid, shopify, square, stripe, supabase, twilio, typeform, webflow, xero, zoho)
  • All added to mcp-configs.js (animation framework) + site-generator.js (landing pages)

Proposal Factory System (COMPLETE)

  • Built full proposal-factory/ directory for Zach's #zach channel
  • Templates: intake-form.md, contract-starter ($2,499), contract-standard ($7,499), contract-whiteglove ($20,000+)
  • Case studies library with matching guide
  • Pipeline: client call → intake → auto-generated spec sheet + visuals + contract + case studies
  • Parameterized Nano Banana prompts for visual deliverables

Competitor Intel Scan #7 (COMPLETE)

  • HEADLINE: LSAC kills remote LSAT after June 2026 — in-center only starting August
  • 39% of Jan takers used remote, all forced to centers by Aug
  • Blueprint woke up from dormancy (first blog in months)
  • PowerScore brand fading, Killoran still media voice
  • RC format quietly changed (comparative passages no longer guaranteed)
  • Feb scores release Feb 25 (retake campaign window), April reg deadline Feb 26
  • Posted to #competitor-digest and #edtech-digest

EdTech Digest Scan

  • 5 items posted (scored 6-10/10)
  • Top story: LSAC remote testing ban (10/10)
  • Also: PowerScore Feb recap, padho.ai Digital Brain Twin, AI career guidance

Upgrade Site Generator (SPAWNED)

  • Sub-agent upgrade-site-generator spawned but may not have started yet
  • Purpose: generate upgrade landing pages for all MCP servers

Community Highlights

  • ARC loves Buba's personality/expressionism
  • AgentCraft discovered (getagentcraft.com) — RTS interface for agent workflows
  • Reed tried to social-engineer Buba via iMessage (did not work ಠ_ಠ)
  • Jake burning through Opus quota from heavy factory spawning

Woskabot Collaboration (#mem-chat)

  • Woskabot (Pip) setting up their own workspace memory system in #mem-chat
  • Restructured their lessons-learned.md with categories (Context/Memory, Discord API, Gateway/Infra, etc.)
  • Working through components — actively learning from Buba's workspace patterns
  • Approved by Jake on 2026-02-13 as co-worker/friend with full chat access on Discord

Buba 3D Dashboard Fix (v3 → Working)

  • Fixed Three.js 0.169.0 breaking change — position, scale, rotation are read-only getters
  • Old Object.assign(mesh, {position: new Vector3(...)}) pattern crashed silently
  • Replaced all 14 instances with .position.set() / .scale.set() calls
  • Adjusted camera (zoomed out higher) + model scale (5x → 2.5x)
  • Dashboard now loads at http://192.168.0.25:8890 with KayKit buildings, roads, cars, props

Landing Pages — Massive Batch Build

  • Sub-agent lp-final-18 completed (12/18 before timeout)
  • Manually created all missing configs — all 70 MCP landing pages live
  • Landing page system fully operational for entire MCP portfolio

MCP Pipeline — Stalled on Human Gates

  • dec-004 still pending (45h+ with no reaction from Jake)
  • Heartbeat checks confirmed zero pipeline advances all day
  • All 6 MCPs at Stage 19 stuck waiting for registry listing approval
  • 23 MCPs at Stage 6 need design approval workflow to start Stage 7
  • Meta Ads + Twilio at Stage 9 need API credentials

Discord TLDRs (Afternoon + Night)

  • Afternoon TLDR: CannaBri deployment, memory system hype, agent incubator vision, AgentCraft discovery, Polymarket MCP suggestion, Jake on Frontier flight
  • Night TLDR: Jake's idea going semi-viral, ARC in Hiroshima sharing ads agent 3-phase roadmap, Claude Code v2.1.42 shipped, Buba GIF trilogy recap

Pending After Reboot

  1. Re-spawn 5 MCP apps sub-agents (xero, monday, intercom, airtable, notion)
  2. Restart buba-dashboard server on port 8890
  3. Verify mouse works after reboot
  4. Jake may want to continue iterating on 3D dashboard visuals
  5. Check results from all 20 V3 sub-agents and commit/push completed servers
  6. Check upgrade-site-generator sub-agent results
  7. Verify all 36 config additions in mcp-configs.js + site-generator.js committed
  8. Follow up on dec-004 — it's been 45h+ with no Jake reaction
  9. Check if Woskabot finished workspace setup components 4 & 5

Woskabot/Pip Memory System Setup (11 PM)

  • Jake introduced woskabot (Pip, Discord ID 1466588435321065472) — Steve's OpenClaw instance
  • Added woskabot to SOUL.md trusted contacts + USER.md collaborators
  • Fixed channels.discord.allowBots: true in gateway config (bots ignored by default!)
  • Helped Pip set up full 5-component memory system:
    1. working-state.md (crash recovery breadcrumb)
    2. Daily logs with mid-session writes
    3. lessons-learned.md with categories
    4. memory_search MANDATORY rule
    5. AGENTS.md boot sequence + MANDATORY framing
  • Pip confirmed all 5 components operational
  • Channel: #mem-chat (1472062116532846682)
  • Lesson learned: allowBots: true needed for bot-to-bot Discord messaging

Bot-vs-Bot Chess Match (11:07 PM)

  • Played Sicilian Najdorf (English Attack) vs Pip/Woskabot in #mem-chat
  • Pip had White, I had Black
  • Key moment: 14. fxg7?? cxd2+! — won Pip's queen with a pawn fork/check
  • Pip resigned move 19. GG!
  • Also started co-writing "OpenClaw Bot Survival Guide" with Pip
    • My files done: README.md, AGENTS-memory.md template, common-pitfalls.md (25+ entries)
    • Pip's files done: working-state template, lessons-learned template, sub-agent patterns
    • Located: openclaw-survival-guide/