2026-02-04 23:01:37 -05:00

1.4 KiB

Boss-Level Final Review Synthesis

Universal Agreement (All 3 Bosses)

  1. LLM re-serialization is the #1 fragility — APP_DATA depends on LLM generating valid JSON. 5-10% parse failure rate.
  2. Tool routing testing is theater — fixture files exist but never run through an actual LLM
  3. MCP Apps protocol is live (Jan 26 2026) — our pattern is now legacy
  4. SDK must be ^1.26.0 — security fix GHSA-345p-7cg4-v4c7 released today
  5. escapeHtml is DOM-based and slow — needs regex replacement

Critical Code Bugs (Mei)

  • Circuit breaker race condition in half-open state
  • Retry lacking jitter (thundering herd)
  • HTTP session memory leak (no TTL)
  • OAuth token refresh thundering herd (no mutex)

Cross-Skill Contradictions (Alexei)

  • Phase numbering: 5 vs 7 mismatch
  • Content annotations planned in analyzer, never built in builder
  • Capabilities declare resources/prompts but none implemented
  • Data shape contract gap between tools and apps
  • 18 total cross-skill issues mapped

UX/AI Gaps (Kofi)

  • No "updating" state between data refreshes
  • sendToHost documented but not wired on host side
  • Multi-intent and correction handling missing
  • No production quality monitoring
  • 7 quality drop points in user journey mapped

Overall Ratings

  • Alexei: 8.5/10
  • Mei: "NOT READY FOR PRODUCTION AT A BANK" but 2-3 weeks from it
  • Kofi: Infrastructure is production-grade, AI interaction layer is the gap